Robotics Videos
Videos
- This video is filed under:
- Industry
- Application
- Peripherals

Neocortex G2R Cell Rapid Deployment (March 2017)
Universal Logic Posted 03/07/2017
A Neocortex® G2R (Goods to Robot) Cell is easy to deploy within a day. Here is a time-lapse video showing a Universal Application Engineer setting up a Cell. It's operating in 2 hours. After it is up and running, our team then optimizes the robot and trains the operators. This is similar to what is required for a collaborative robot, and contrasts with integrating an industrial robot system that may take weeks before being ready to run.